breashaeeboo5183 breashaeeboo5183
  • 19-04-2024
  • Engineering
contestada

The life cycle cost of a green building is always a negative number that represents the total costs and savings along the building life cycle.

a. True
b. False

Respuesta :

Otras preguntas

the fourth common multiple of two whole numbers is 224. Find the seventh common multiple​
What did Joan’s visions tell her to do? 7TH Grade
3. Evaluating Do you think David's solution was successful? Explain your answer.
Questions 1 Identify Relevant learning resources [4]​
3 Jason starts a run at 10.05 am and finishes at 1.02 pm. Work out the time Jason takes to complete the run.​
Lola spent $39 on 13 notebooks. Find the simplified ratio of notebooks to dollars.
O 15 It is estimated that 7x10^6kg of water pours over the Niagara Falls every second. If the falls are 50 m high, and if all the energy of the falling water co
solve for u. -5(u-5)=4u-47
What threats did the Byzantine Empire face from the Muslim world in the 11th century?
Find the grade point average. Assume that the grade point values are 4 points for an A, 3 points for a B, and 2 points for a C, 1 point for a D, and 0 points fo