grayschantrell1977 grayschantrell1977
  • 19-02-2019
  • Mathematics
contestada

The equipment operates 5 days a week for 12 hours each day according to last weeks production numbers shown in the table how many feet of chain were produced per operating hour

Respuesta :

ag4588186
ag4588186 ag4588186
  • 19-02-2019

Answer:

cawnser is 60

Step-by-step explanation:

because 5 times 12 is 60 hours

Answer Link

Otras preguntas

What word describes the moving of animals from one part of the world to another?
Which of the following is the least? A.0.105B.0.501C.0.015D.0.15 I don't need an answer i need an explanation
For the function y=f(x), what is the ordered pair for the point on the graph when x= b-2?A) (b-2, f(b-2))B) (x, f(b))C) (x, b-2)D) (b - 2, f(b))
Given that 6x = 7y, find the ratio x:y.
A pendulum is dropped 0.50 m from the equilibrium position as shown below.  What is the speed of the pendulum bob as it passes through the equilibrium position?
conservation between hitler and gandhiji (10 exchange)
How do I say.. I'm Watching television in German?
how to do an analysis?
A bedroom measures 15 ft by 14 ft with a closet that measures 4 ft by 8 ft. if carpet costs $4.25 per foot, how much will it cost to carpet the room and closet.
A and B share the cost in a ratio of 3:2. the cost is £85; How much does A pay?