rileyguldberg1966 rileyguldberg1966
  • 16-07-2020
  • Physics
contestada

A crane lifts a 425 kg steel beam vertically a distance of 64 m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s2

Respuesta :

samuelonum1
samuelonum1 samuelonum1
  • 21-07-2020

Answer:

work done= 48.96 kJ

Explanation:

Given data

mass of  load m= 425 kg

height/distance h=64 m

acceleration a= 1.8 m/s^2

The work done can be calculated using the expression

work done= force* distance

but force= mass *acceleration

hence work done= 425*1.8*64= 48,960 J

work done= 48.96 kJ

Answer Link

Otras preguntas

Where might a pronoun’s antecedent appear? before the noun in the sentence in an entirely different sentence all of the above after the noun in the sentence
3-4 sentences describe each stage of the water cycle
what does 55 and 100 have in common?
5 5/32 turned into decimal
how did the beliefs of judaism emphasize the worth of the individual
(27x 5 + 9x 4 - 18x 3) 9x 2 what is the answer
How do the authors of “A Psalm of Life” and "Auspex" use different images to illustrate their themes?
what was nancy number how do you know this greatest possible number for these digits
Organic farming avoids the use of chemicals. true or false
Why is "the story of an hour" by Kate Chopin be considered realistic?