Kiara12004
Kiara12004 Kiara12004
  • 19-07-2020
  • Mathematics
contestada


12. If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take
10 men to dig a hole 7 metres deep?

Respuesta :

umaima2005 umaima2005
  • 19-07-2020

Answer:

2 days

because if it takes 6 men to dig a hole in 4 days which is 3 metres long it will take 2days for 10 men to dig a hole which is 7 metres long

Answer Link
jasminreveles000 jasminreveles000
  • 25-02-2021

Answer:

8 days

Step-by-step explanation:

Answer Link

Otras preguntas

how can resistance be useful and where can they be useful?
18. The orbits of planets being elliptical was one the planetary laws developed by
how to solve 2^(log(2)3+ log(2)5
When an object moves, stops moving, changes speed, or changes direction, how do scientists describe that condition?
what does it mean if someone is your 'flesh and blood'?
what is cognitive grammar?
List the six external parts or "peripherals" of a computer system and identify which are the output and which are the input devices
what are the different types of prologues?
Julia has 4 gallons 2 quarts of water.Ally needs the same amount of water but only has 12 quarts.How much more water does Ally need?
what are the best tips for writing an essay conclusion?