prashant123 prashant123
  • 17-04-2021
  • Mathematics
contestada

IF 30 Men Car do a piece of Work in 30 days the
in how many days 10 men can complete the Same work​

Respuesta :

Аноним Аноним
  • 17-04-2021

Answer:

let, the days for 10 men be x

  • 30/10=x/30
  • 900=10x
  • x=900/10
  • x=90

so 10 men can complete the same work in 90days.

Hope it helps.

Answer Link
Shanedm
Shanedm Shanedm
  • 17-04-2021
10 days because 30 men = 30 days, so in that logic 10 days = 10 men
Answer Link

Otras preguntas

The outstanding check total: A)$158.53 B)$246.53 C)$48.00 D)$914.47 This is all it says.
An investment project costs $10,000 and has annual cash flows of $2,920 for six years. a. What is the discounted payback period if the discount rate is zero per
Which set of ratios could be used to determine if one triangle is a dilation of the other
A poorly constructed room is suffering from a pipe leakage problem. The leaked pipes are continuously flooding the 90-m2 room such that the water level in the r
What is the magnitude of the position vector whose terminal point is (6, -4)?
public speaking help? will give brainliest.
I have a brother that is 17 and I am 2x younger then my brother that 1 year younger then him how old am I?
In what ways can capitalistic and socialistic economies converge?
What do exponential functions model in the real world? How does the standard equation form of the exponential equation change in each situation?
Can you think of a time when your behavior in a crowd was dictated by the circumstances? Give an example of emergent-norm perspective, using your own experience