  • Mathematics
contestada

5 people cleared a plot of land in 15 days.How many people would i need to hire to clear three times that plot in 5 days​

Respuesta :

day1005
day1005 day1005
  • 18-07-2021

Answer:

45 people

Step-by-step explanation:

Answer Link
eilliyahrameen
eilliyahrameen eilliyahrameen
  • 18-07-2021

Answer:

45

Step-by-step explanation:

ln 15 days 5ppl work

ln 15 days if three times of that ppl work=5×3

=15ppl

So in 1 day=15×15\5 ppl

=45ppl

lt takes 45ppl to clear three times the plot in 5 days.

Answer Link

Otras preguntas

what is the KE of a 1 kg ball traveling at 30 meters per second?
Compare Ponyboy and Cherry Valance
in what year did the civil war being?
express each as a single power of 2...2^a X 2^b X 2^c2^a+b X 2^a-b
Genetic engineering is used in the biotechnology industry to? (1) eliminate all infections in livestock (2) synthesize hormones such as insulin and human growt
what is the KE of a 1 kg ball traveling at 30 meters per second?
Kelly carried a box weighing 10 N the 200 meters from his car to his new house.  George took the box from Kelly and carried it up the 3 meter tall flight of sta
G=H(q+Q)for Q Solve for Q I dont understand how to do this.
A 700-watt gasoline engine and a 300-watt electric motor both do 3 J of work. Which machine can do the work faster? Explain your answer.
when does an inciting incident occur in a plot?