Larissafernandes2008 Larissafernandes2008
  • 21-07-2021
  • Mathematics
contestada


A construction company needs to remove 18 tons of dirt from a construction site. They can remove 2/3 tons of dirt each hour. How long will take to remove the dirt? Write your answer in simplest form

Respuesta :

wegnerkolmp2741o
wegnerkolmp2741o wegnerkolmp2741o
  • 21-07-2021

Answer:

27 hours

Step-by-step explanation:

Take the amount of dirt and divide by the amount per hour

18 tons ÷ 2/3 ton per hour

Copy dot flip

18 * 3/2

Rewriting

18/2 * 3/1

9*3 = 27

27 hours

Answer Link

Otras preguntas

how to simplify 17+4x5
Can someone help me: 4n-3=-2n+15
To disinfect 1 quart of stream water to make it drinkable,you need to add 2 tablets of iodine. How many tablets do you need to disinfect 4 quarts
−5.010010001... number is rational or irrational or integer or real number?
A hypothesis that has been rigorously tested is called
Write three integers that do not all have the same sign that have a sum of -20
A jump rope is shaken producing a wave with a wavelength of 0.5m with the crest of the wave passing a certain point 4 times per second. What is the velocity of
what is the relationship between the 6s in the number 6647?
How do you solve this equation?  8x-y=16
Acid and an alkali combined together will give a salt,if they are mixed in the right amount1)What is the name given to this reaction