lcrespino3010 lcrespino3010
  • 19-11-2021
  • Business
contestada

Your boss wants to know how long your project is going to take. Which part of the plan should you share with your boss?

Respuesta :

ains89
ains89 ains89
  • 19-11-2021

Answer:

the estimated amount of time it takes to get the project done

Answer Link

Otras preguntas

- Compute the weight in N of a steel shaft ,35 mm diameter ,675 mm long. The density of steel is 7680 kg/ m3. i know i have to convert the units to cm and find
what characteristic of earth results in different seasons over a period of a year
System of equations X+3y=73 X+y=27
A CAUSE of the First Crusade was the __________. a.conquest of Constantinople by the Ottoman Turks b.invasion of Spain by the Muslim Arabs c.attack by the Musli
You purchase a pair of jeans online. You will be charged 6% sales tax on the jeans and an additional shipping charge of $8.95, which is not taxed. Write an expr
What body in the solar system do you think is one focus of the moons orbit
rewrite 11/12 as a fraction in 2 different ways
What is a fresco? A. a form of art in which watercolors are applied to natural stone B. a new start on a piece of art C. a painting that artists create by apply
rewrite 11/12 as a fraction in 2 different ways
Ecrivez al forme correcte du verbe etre pour chaque sujet