pc8r5kasy8 pc8r5kasy8
  • 18-12-2021
  • Physics
contestada

A train starts at rest and ends up with 1500 J of kinetic energy. How much work was done on the train?

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 18-12-2021

Answer:

  1500 J

Explanation:

Apparently, we're to assume that no energy is lost to friction or other effects. Then all of the energy the train has is due to work being done on it.

  1500 J of work was done on the train

Answer Link

Otras preguntas

Someone help me write a poem about racism!! It needs to be at least 6 lines. This is what I have so far... {Racism} We must all bring racism to an end Bend the
every 2 weeks i get paid starting september 23 when is my next pay day
What Native Texans lived in grass huts and ate mostly Buffalo, fish, deer, and corn.
based on the equation 5×x+860=2×x+380, you can say​
A manufacturer of bolts has a​ quality-control policy that requires it to destroy any bolts that are more than standard deviations from the mean. The​ quality-c
If a=-5, find the value of 2a² - 5a - 10​
A company is designing a rectangular computer chip that is 8.14 × 10^−7 meters long and 3.6 × 10^−9 meters wide.Part A: Determine the area of the computer chip.
Are there any parts of the Roman Empire that are not connected by roads? (answer quickly i need it for my homework.)
At what floor did the second plane crash into the south tower of the world trade center?.
What general information about the serengeti do we need to research to further investigate the causes for the changes in the african buffalo population?