xoliswaangela467 xoliswaangela467
  • 21-01-2024
  • Mathematics
contestada

it takes 6 workers 8 hours to tile a hall. how long will it takes 4 workers to complete the same task?
​

Respuesta :

ayenoe13
ayenoe13 ayenoe13
  • 21-01-2024

Answer:

Step-by-step explanation:

1 hall​/8 hours×6 workers=6/8​ halls per hour

The work rate of 4 workers who can tile the same hall is:

1 hall​/x hours×4 workers=4/xhalls per hour

Since the work rates of 6 workers and 4 workers are equal, we can set them equal to each other and solve for x:

6/8​=4/8

x=8x4/6

x=32​/6

Therefore, it will take 4 workers 5.33 hours to tile the same hall.

Answer Link
lem200765 lem200765
  • 21-01-2024

Answer:the answer should be that it takea 4 workers 5.33 hours

Step-by-step explanation:

Answer Link

Otras preguntas

Ome members of the anti-imperialist league felt that:
Multiple Choice Precalculus Question!
iven: Q = 7m + 3n, R = 11 - 2 m, S = n + 5, and T = -m - 3n + 8. Simplify R - S + T.
Rational drug design involves the development or modification of a drug that is desinged to interact with a specific biological molecule, the biotarget, to prov
Completion of the erie canal allowed ships to travel:
What is (2p+4)+5(p-1)+(p+7)
A pizza parlor offers a choice of 16 different toppings. How many 6-topping pizzas are possible?
why might artists have been reluctant to portray the human figure of the buddha
Quiero dormir. ¿Adónde voy? (2 points) Select one: a. al comedor b. al club de Jóvenes c. a la cabina d. al teatro
The folded inner membrane of a particular organelle where atp is produced in the process of cellular respiration.