Brian has to manage a project with tight deadlines. Help him arrange the stages of project management in the correct sequence.

Brian has to manage a project with tight deadlines Help him arrange the stages of project management in the correct sequence class=

Respuesta :

laurynstiles202 laurynstiles202
  • 18-11-2017
I think it is 2, 4, 1, 5, 3 the numbers are the cards down
Answer Link
Adrian980098 Adrian980098
  • 20-01-2021

Answer:

plato users

Explanation:

1  initiation

2 planning

3 execution

4 monitor and control

5 closure

 

Answer Link

Otras preguntas

The main goal of the Southeast Asia Treaty Organization was to revise existing trade treaties. do away with political alliances. prevent the spread of communism
Which word BEST describes the speaker? A) Foolish B) Humorous C) Inventive D) Miserable
Tyler also want to leave a tip for the server. How much do you think he should pay in all
A “blitz” is different from a “blitzkrieg” because only a “blitz” targets civilians. relies exclusively on air power. takes place at great speed. destroys large
The half-life of a radioactive substance is 12 days. After 11 days a sample of the substance has been reduced to a mass of 7 mg. What was the initial mass (in m
Help meeeeeeeeeeee please
Parallel lines s and t are cut by a transversal, r, as shown. Parallel lines s and t are cut by transversal r. Clockwise from top left, the angles formed by lin
2x+3(5x−7)=47 Solve for x
If the measure of angle 2 is (5x+14)" and angle 3 is (7-14). what is the measure of angle 1 in degrees?
What is the y-intercept of the following equation?y =[tex] \frac{ - 5}{4} x + 4[/tex]​