What conditions must exist for separate contracts to be viable?

Respuesta :

W0lf93
W0lf93 W0lf93
  • 30-01-2018
The owner must be an in house CM or construction engineer to administer the contracts. CM is established as an independent contractor. The CM is responsible to the owner to complete the project by the established substantial completion date and within the agreed budget. The CM must compensate the owner when the construction does not satisfy the established standards of performance for a project.
Answer Link

Otras preguntas

Which of the following is the radical expression of a to the four ninths power
Heart disease is thought to be a polygenic disorder in humans. knowing this, what would you expect to see if you screened a large number of people for heart dis
Which ethical principle reflects the idea that people have entitlements that let them act in a certain way?
After the collapse of the Soviet Union most former satellite countries set up what
Can someone please help ASAP?
Factor completely 21x3y4 + 15x2y2 − 12xy3.
What group does the president most rely upon for day to day advice
Determine the slope of a line that makes an angle of 5pi/4 radians with the x-axis.
Classify the triangle based on side lengths 5, 15, 19.
Hydraulicists often express rainfall in acre-feet. this is the amount of water required to cover an area of one acre to a depth of one foot. there are 640.0 acr